AllCare handles every phase of your ADU project in-house — from feasibility and architectural design through permit approval and construction. One accountable team, start to finish.
AllCare handles every phase in-house — from initial feasibility and architectural design through permit approval and construction. We assign one project manager who stays with your project from the first call to final walkthrough. Most San Diego ADU projects take 6–12 months from design to move-in.
Every property is different. We build all types of ADUs and help you choose the right option for your property and goals.
A standalone structure separate from your main home — the most flexible option for rental income or independent family living.
An addition connected to your existing home — ideal for maximizing space while sharing walls and utilities.
Convert your existing garage into a fully permitted living space — typically the most cost-effective ADU option.
A smaller unit (up to 500 sq ft) carved from your existing home. Streamlined permitting requirements under California law.
California's ADU laws make now the best time in decades to add value to your San Diego property. AllCare handles everything — from feasibility to move-in day.
Six steps. One team. Zero surprises. Here's exactly how your ADU project runs from start to finish.
We review your property, zoning, and goals to determine the best ADU option before any design work begins.
Our in-house design team creates architectural plans and 3D renderings matched to your vision and property.
We manage all permit applications, plan check responses, and inspections with San Diego County — you don't touch it.
You receive a written scope, timeline, and fixed-price proposal before any commitment is required.
Our own crew builds your ADU with consistent quality. A dedicated PM keeps you updated at every milestone.
We walk every inch of the ADU with you before close-out to make sure everything is exactly right.